I-10 Gila River to Gas line Road Mileposts 174 – 177
-
Add third general-purpose lane in each direction within the existing median
-
Reconstruct Casa Blanca Road/SR 587 bridge and reconfigure the interchange to a traditional Diamond Interchange
-
Reconstruct and widen Nelson Road bridge
-
Improve infrastructure and install freeway management system: fiber optic cable, CCTV cameras and overhead message boards
Construction is anticipated to begin in late 2026 and last approximately two years. Construction cost for this project is approximately $158.4 million.
Expected Construction Timeline Late 2026 – Mid 2028